UERL/SINOPEC/SEVEN ENERGY/PMA BROS

6” (31KM) GASLINE TIE-IN FROM UQUO TO STUBCREEK COVERING INSTALLATION OF COMPLETE ESD VALVE WITH ACTUATOR, INSTALLATION OF TRANSMITTERS(TT,TIT,PIT,PDIT),FLAME DETECTOR, OPEN PATH GAS DETECTOR, MANUAL CALL-POINTS,JB’S, CABLE TRENCHING AND LAYING, CABLE TRAY INSTALLATION, INSTRUMENT CALIBRATION, WELDING,FABRICATION AND INSTALLATION OF JB’s & INSTRUMENT SUPPORT

Leave a Reply

Your email address will not be published. Required fields are marked *